NEWS

-
-
-
Advantages of pneumatic chucks and installation instructions

Advantages of pneumatic chucks and installation instructions

(Summary description)The operation of CNC mechanical equipment is inseparable from the chuck, and the pneumatic chuck can ensure the accuracy of the lathe equipment. It has the advantages of simple structure, labor-saving installation and so on.

Advantages of pneumatic chucks and installation instructions

(Summary description)The operation of CNC mechanical equipment is inseparable from the chuck, and the pneumatic chuck can ensure the accuracy of the lathe equipment. It has the advantages of simple structure, labor-saving installation and so on.

Information

The operation of CNC mechanical equipment is inseparable from the chuck, and the pneumatic chuck can ensure the accuracy of the lathe equipment. It has the advantages of simple structure, labor-saving installation and so on. So how should pneumatic chucks be installed? What are the advantages compared to ordinary chucks?

Advantages of pneumatic chucks

1. Compared with ordinary chucks, the work efficiency of pneumatic chucks will be greatly improved, for example, in terms of clamping. And the practical life span will be much longer in comparison.

2. The pneumatic chuck structure is very, very simple, without those complicated parts and components, so the installation is very convenient and labor-saving, and it is not easy to cause mistakes.

3. In terms of consumables and energy, it can be called no consumption. Moreover, environmental protection has no pollution, which is a practical and superb advantage today when environmental pollution is increasing day by day.

4. In the machinery industry, everyone knows that safety is the most important item. Therefore, the pneumatic chuck has strict factory inspection, pressure test, and error test, all of which are zero danger. Therefore, the pneumatic chuck can be accepted and used by the majority of users in the field

Instructions for installation of pneumatic chuck

1. Take out the connecting sleeve, screw on the screw, and connect it to the tail of the main shaft. Use a dial indicator to correct the outer circle and end face of the connecting sleeve to within 0.05MM, and tighten the screw.

2. Take out the chuck, wipe it clean with a rag, and use a caliper to measure whether the flange size of the lathe is consistent with the connection size of the chuck. If it does not match, please finish machining the flange according to the size of the chuck.

3. Take out the spiral trachea, put on the accessories and hoop, and install the trachea on the vent nozzle of the chuck. Then use a vise to clamp the hoop so that the trachea must not be damaged during installation.

4. Wrap the trachea with a capsule in sections to ensure smoothness, and then mark the trachea tail unit with No. 1 and No. 2. Then tie the air pipe through the main shaft of the lathe with a thin iron wire, so that the air pipe can pass through the main shaft smoothly, and the holding chuck is moved backward synchronously and lightly buckled on the flange.

5. Take out the screw, fix the chuck on the flange, and measure the outer circle runout ≦0.05.

6. Tighten the trachea, cut off the excess trachea at the tail, and reserve about 50-100mm on the outside of the main shaft. And it can bounce back into the spindle naturally, and then try to blow the No. 1 and No. 2 trachea to observe whether the chuck moves smoothly.

7. Put on the hoop, connect the No. 1 and No. 2 air pipes to the No. 1 and No. 2 air nozzles on the pneumatic gyrator respectively, and then clamp the hoop.

8. Rotate the air pressure gyrator and the connecting sleeve thread, and then try to blow the No. 1 and No. 2 air holes. Observe whether the movement of the chuck is smooth to prevent the air pipe from being twisted at the pneumatic gyrator.

9. Fix the "anti-rotation screw" at the lower part of the pneumatic gyrator to prevent it from rotating with the spindle.

10. First fix the circuit board and switch on the lathe, near the air pressure gyrator, and then connect the air pipes one by one, and introduce the power supply 220V or 24V.

11. Fill up the oil reservoir on the oil-water separator, ventilate and adjust the pressure and oil output, power on the machine tool, operate the switch, and the chuck can move smoothly.

Scan the QR code to read on your phone

Related Reading

Subscribe to our news now!

Username used for comment:
Feedback
Description:
Bdefu machinery

Our products mainly serve major
machine tool manufacturers, major
machinery parts manufacturing companies and professional
manufacturers in various machinery
and equipment fields.

Copyright © 2021 Bdefu machinery technology (Changzhou) Co., Ltd. 京ICP证000000号 Powered by: www.300.cn IPv6 is supported
返回顶部